Due to some unforeseen obstacles, the project has been a bit delayed. Adding a new bathroom and redoing the old bathroom has turned out to be a major task. The plumber discovered all the pipes were corroded and so he has been working non stop to fix it all in a 24" crawl space!
Another set back was when they were getting ready to tile they discovered there was not enough structural support, so that has to be taken care of first. While there has been some bumps along the road and it is taking longer than anticipated, we feel it a blessing that these things were discovered and they are getting taken care off.
Onto more exciting things! We have kitchen cabinets in! They are custom designed and donated! A big thanks to Brandon Wall for designing and building them and Jenson Lumber who donated the wood.
Paint is starting tomorrow, then a lot of the cosmetic things will follow. The new plan is to have the reveal on Monday, February 13th. (That is if things move forward without a hitch.)
We again can not thank all of these people enough. Most volunteers are strangers to Marianne and Larry, and have given so much to this project. In a world of much hate, and chaos; there is still so much love and kindness.